







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Fullerton, CA
A tub-to-shower conversion in Fullerton typically costs $4,800 to $11,500 for a full tear-out and rebuild, and most jobs are finished in 4 to 7 working days. We remove the tub, bring the drain and waterproofing up to current code, and install a tiled or acrylic shower sized to the actual alcove – not a liner dropped over the old tub. If you’re weighing this against a wider remodel, our Bathroom Remodeling in Fullerton page covers the full scope, and we’re happy to talk through which one fits your bathroom.
Call (844) 320-7095 and a live person answers, day or night. Before any work starts, you get a flat written price with a written scope and written warranty. No change proceeds until you’ve signed a change order. That discipline is Clause 1 of The Haven Standard, and it’s why projects finish within a few percent of the number you agreed to.
The older housing stock around downtown Fullerton and the neighborhoods off Harbor Boulevard is where this work gets interesting. A lot of these homes were built between the 1920s and the 1960s, and many still have cast-iron drains and a tub set into a wet-bed mortar floor. Pulling that out cleanly is a different job than a conversion in a 2005 townhome near the Fullerton Loop. We scope for the house that’s actually in front of us.
Key Takeaways
- Typical Fullerton tub-to-shower range: $4,800 to $11,500, depending on waterproofing method, tile, and whether the drain needs relocation.
- Most conversions take 4 to 7 working days from demolition to final sealant.
- Every visit includes a documented photo record of what we found and what we installed – standard, not an upgrade.
- We quote a flat written price before any tool comes out of the truck.
- Our technicians have up to 19 years of experience on residential bathroom work.

When You Need Tub-to-Shower Conversion
Most of the calls we get in Fullerton aren’t strictly “want a new shower.” They’re a specific problem that a conversion solves. Here’s what tends to prompt the call:
- The step-over is getting risky. A high tub wall is the most common fall hazard in an older bathroom. If someone in the house is recovering from surgery or simply isn’t steady on their feet, a low-threshold shower removes the daily risk without a full remodel.
- The tub is original and the drain is failing. In Fullerton homes from the 1940s and 1950s, we regularly find cast-iron drain lines that have rusted nearly closed. The tub looks fine; the water just drains slow. Converting lets us replace the trap and the line into the stack while we’re open.
- Nobody uses the tub. A guest tub that’s been dry for a decade is wasted square footage. A walk-in shower makes a small Fullerton bathroom feel larger because the eye gets the whole alcove instead of a blocked box.
- Water is getting behind the surround. A soft spot near the tub edge or peeling caulk that keeps coming back usually means the moisture barrier has already failed. That’s a rebuild, not a re-caulk.
- You’re selling or renting and need it to appraise clean. A tired tub reads as dated to a buyer. A code-compliant shower with a documented install reads as maintained.
- The tub is set in a wet-bed that’s cracked. Some mid-century Fullerton builds used a mortar bed under the tub that cracks and shifts. That often shows up as a tile crack line or a tub that rocks slightly – a signal the substrate needs attention, not a new tub.
Our Tub-to-Shower Conversion Process
Here’s what actually happens, in order, so you know what to expect on each day the crew is in your house:
- Measurement and written price. We measure the alcove, inspect the drain, and check the wall substrate. You get a flat written price covering the scope we found, in dollars, before anything is ordered.
- Protection and demolition. Floors and adjacent rooms get covered. We pull the tub, remove the surround, and cut out to the studs. If the drain is cast iron or the subfloor is soft, we document it with photos and quote any added work as a written change order before touching it.
- Rough-in and waterproofing. Drain relocation if needed, new shut-off valves, and a sloped pan. We use a bonded waterproofing membrane such as a liquid-applied system or a cement board with a sheet membrane – the choice depends on the substrate and your tile. This is the step that decides whether the shower lasts 5 years or 25.
- Tile and fixtures. Wall tile, floor tile with a slip-resistant finish, niche, and trim. We name the fixture brand in the quote – Kohler and Toto are what we source most for Fullerton conversions – so there’s no “builder-grade mystery faucet” surprise.
- Glass, sealant, and final inspection. Frameless or semi-frameless glass door, silicone at all wet joints, and a walk-through where you see the photo record of the framing, the membrane, and the finished install.
That photo record is included on every visit, not sold as an add-on. You get evidence of what we found behind the wall, which matters if you ever sell the house or file an insurance claim. Our crews are background-checked and uniformed.

Tub-to-Shower Conversion Pricing in Fullerton
Below are the honest ranges we quote in Fullerton. These are real numbers, not teaser pricing – the low end is a standard alcove with acrylic walls, the high end is custom tile with a linear drain and glass.
| Line Item | Typical Range |
|---|---|
| Basic alcove conversion, acrylic pan and walls | $4,800 – $6,500 |
| Tiled shower with standard drain, membrane waterproofing | $6,800 – $9,000 |
| Custom tile with linear drain, niche, bench | $9,000 – $11,500 |
| Drain relocation (moving the trap or tying a new line into the stack) | $450 – $1,200 |
| Frameless glass door and panel | $700 – $1,600 |
| Cast-iron drain replacement to the stack | $900 – $2,200 |
| Subfloor repair where the tub leaked | $300 – $1,500 |
What moves the number most: the waterproofing method, whether you’re going tile or acrylic, and the state of the plumbing under the floor. Fullerton homes with the original cast-iron drain often land in the middle of these ranges because the drain work is unavoidable once the floor is open. We’d rather tell you that at the quote stage than after.
Every quote is a flat written price with a written scope and written warranty. There’s no “call for a quote” here – you get the number in writing. And if you’re holding a competitor’s estimate, we’ll review it line by line at no charge under our Free Second Opinion offer, so you can see what’s covered and what isn’t.
Call (844) 320-7095 for a free estimate. Estimates are free, the price is written before work starts, and the 365-Day Done Right Promise is printed on every page – under The Haven Standard, if it’s not done right, we make it right.
FAQs – Tub-to-Shower Conversion
How much does a tub-to-shower conversion cost in Fullerton?
A tub-to-shower conversion in Fullerton typically runs $4,800 to $11,500, with most standard tiled alcoves landing between $6,800 and $9,000. The price depends on waterproofing method, tile versus acrylic, and whether the drain needs relocation. Call (844) 320-7095 for an exact quote – estimates are free and written.
Can you finish a tub-to-shower conversion in one week?
Most conversions take 4 to 7 working days from demolition to final sealant, so a one-week turnaround is realistic for a standard alcove. Jobs with cast-iron drain replacement or subfloor repair add a day or two. We schedule the whole job up front and tell you the finish date in writing.
Is it cheaper to repair the tub or convert to a shower?
Converting is usually cheaper over the long run when the tub is original and the surround has failed. A patch repair on a 40-year-old tub-and-surround runs $800 to $2,500 and often fails again within a few years because the moisture barrier behind the wall is already gone. A conversion replaces the waterproofing, the drain, and the surface in one job – so you’re not paying twice.
Can you convert a tub to a shower if the drain is in the wrong spot?
Yes. Moving the drain is routine and typically adds $450 to $1,200 to the job. We open the floor, relocate the trap and tie into the existing stack to code, then re-waterproof. It’s a scoped, quoted line item before we start – never a surprise after the floor is open.
Do I need a permit for a tub-to-shower conversion in Fullerton?
In most cases, yes – a conversion that moves the drain or alters plumbing requires a permit through the City of Fullerton building department. We pull the permit and include it in the written scope. You don’t chase paperwork; you get a signed-off inspection with the photo record.
If you’re mapping out a bathroom project and want to see how this connects to the bigger scope – new vanity, lighting, flooring – start with our home page and our Bathroom Remodeling service, which covers the full trade. We source fixtures from Kohler and Toto and, when a home needs new exterior trim or door hardware alongside the bath, from brands like Boral and PGT – our vetted material list runs to more than fifty brands, which is how the written quote carries honest numbers instead of inflated ones. We also handle Roofing, Windows and Doors, Fence Installation, Driveway and Pavers, Home Additions, and Kitchen Remodeling, so a Fullerton homeowner can get one documented price across trades instead of juggling four contractors. Nearby, we work in Anaheim, Brea, and Placentia, and we’re glad to answer questions from Yorba Linda and Buena Park homeowners as well.
Talk to Us Before the Wall Comes Down
The best time to call is before you buy a single tile. We’ll measure, inspect the drain and substrate, and put a flat written price in your hands – with a written scope and written warranty – before any work starts. Our technicians have up to 19 years of experience, our crews are background-checked and uniformed, and a live person answers (844) 320-7095 24/7. Call for a free estimate on your tub-to-shower conversion in Fullerton.
Written by the team at Rowan Construction Group Fullerton, serving Fullerton.


